Serving Thurston, Pierce & Lewis countiesLicensed · Bonded · Insured · SOLISIL785NT(360) 350-8616

Multifamily drywall for Gig Harbor buildings

We handle multifamily drywall installation in Gig Harbor, organizing board and finish by unit, shared area and project phase. Repeated units still get checked against the corridors, stairs and service rooms around them.

Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile

Closet interior with flat drywall sheets visible before finishing.
Drywall sheets installed in a closet, before finishing.

Keep multifamily drywall moving with the unit schedule

Unit renovations and shared-wall projects bring access windows, occupied areas, and specified assemblies into the drywall sequence. A one-size plan can leave board and finishing out of step with the rooms or units that are ready.

Solis installs and finishes multifamily drywall around unit access, sequencing, and the specified wall assemblies. Tying the work to those conditions helps the crew move through the planned areas without losing the finish handoff between units.

  • Drywall work aligned with unit access and sequence.
  • Board and finish carried through the specified areas.
Solis Interiors hanging drywall on a commercial job. See the work →

From bid packet to finished scope

  1. Send the bid packet

    Share plans, finish schedules and your bid date. Solis offers 24–48-hour takeoffs.

  2. Agree the scope and schedule

    Review the itemized scope, assembly details and trade handoffs with Solis before scheduling the work.

  3. Get the space finished

    Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.

Have plans ready? Let’s price the work.

Send a plan link or attach your PDF through the project form.

Multifamily buildings in Gig Harbor

When Gig Harbor's homes were built shapes what is behind the wall and which rules apply to the work.

  1. 2% Before 1940
  2. 2% 1940–1959
  3. 19% 1960–1979
  4. 30% 1980–1999
  5. 46% 2000 or later
Share of Gig Harbor homes by year built. U.S. Census Bureau, 2020–2024 ACS 5-year estimates
21.8%of Gig Harbor homes are in buildings with five or more units

Work in shared buildings is scheduled with the owner or property manager, who sets access and the order of units. U.S. Census Bureau, ACS 2020–2024, units in structure

37.8%of occupied Gig Harbor homes are rented

In rented homes the owner or manager approves the scope; tenants can still send the photos. U.S. Census Bureau, 2020–2024 ACS 5-year estimates

Gig Harbor housing in larger buildings

The Census Bureau's 2020-2024 ACS estimates that 21.8 percent of Gig Harbor's housing units are in buildings with five or more units. U.S. Census Bureau, ACS 2020-2024 5-year estimates, units in structure (B25024)

Separate repeated units from common areas

Repeated unit plans make a takeoff consistent, but corridors, lobbies, stairwells, storage and service rooms often have different wall types or finishes. We count those separately and record the plan revision, wall tags and openings we used. Census estimates put 21.8 percent of Gig Harbor's housing units in buildings with five or more units, and when a unit type changes, we flag which layouts it affects so the base price and revisions are easy to compare.

U.S. Census Bureau, ACS 2020-2024 5-year estimates, units in structure (B25024)

Plan board installation around phased handoffs

Multi-unit work moves through areas as framing, rough-ins and inspections finish. We list which units or floors are ready, what trade access remains and where hanging ends in each phase. A handoff schedule helps coordination without us promising a completion date, and common-area ceilings and service rooms get their own lines when their sequence differs from the apartments.

Gypsum Association GA-216 application and finishing

Follow complete wall and ceiling assemblies

Shared walls and floor-ceilings may carry sound or fire assemblies. GA-600 describes full designs, and each one's framing, layers, attachments, edges and penetrations count toward its stated performance. The approved documents say which apply. We tie the bid to those references and send revisions to the design team, without assuming a rating from the unit count or from one product.

Gypsum Association GA-600 fire-resistance and sound-control designs

Gig Harbor multifamily proposal, by area

Send unit plans, common-area drawings, the current wall schedule, phases and assembly details. We'll break out board and finish by area so your team can check the estimate against the building documents.

Multifamily Drywall Installation questions in Gig Harbor

Can a multifamily drywall estimate be divided by phase?

Yes. Tell us the units, floors or shared spaces in each phase and send the current drawings and close-in handoffs.

Does the drywall proposal assign a fire or sound rating?

No. The estimate follows the complete assembly in the approved documents and doesn't assign a rating on its own.

Request an estimate

Gig Harbor multifamily: unit plans, common areas, plan revision, wall schedule, phases and assembly details.

(360) 350-8616

Share the project details

Share a plan link, add PDF plan sheets, or email your bid packet. Then add your contact details and project ZIP so we can follow up.

What are you planning?

Multifamily Drywall Installation & Finishing

Email bid packet

Photos up to 25 MB before prep; PDFs up to 20 MB. Up to 5 files, 40 MB total. Private with your request; photo location metadata is removed.

Company, schedule & project notes

We’ll use these details to respond to your project request.

Text us photos for a quick estimate!