Drywall for Centralia apartment buildings
We do multifamily drywall installation in Centralia from unit plans, common-area drawings and wall types, counted building by building and phase by phase.
Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile

Keep multifamily drywall moving with the unit schedule
Unit renovations and shared-wall projects bring access windows, occupied areas, and specified assemblies into the drywall sequence. A one-size plan can leave board and finishing out of step with the rooms or units that are ready.
Solis installs and finishes multifamily drywall around unit access, sequencing, and the specified wall assemblies. Tying the work to those conditions helps the crew move through the planned areas without losing the finish handoff between units.
- Drywall work aligned with unit access and sequence.
- Board and finish carried through the specified areas.
From bid packet to finished scope
Send the bid packet
Share plans, finish schedules and your bid date. Solis offers 24–48-hour takeoffs.
Agree the scope and schedule
Review the itemized scope, assembly details and trade handoffs with Solis before scheduling the work.
Get the space finished
Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.
Have plans ready? Let’s price the work.
Send a plan link or attach your PDF through the project form.
Multifamily buildings in Centralia
When Centralia's homes were built shapes what is behind the wall and which rules apply to the work.
- 23% Before 1940
- 11% 1940–1959
- 22% 1960–1979
- 28% 1980–1999
- 16% 2000 or later
- 17.0%of Centralia homes are in buildings with five or more units
Work in shared buildings is scheduled with the owner or property manager, who sets access and the order of units. U.S. Census Bureau, ACS 2020–2024, units in structure
- 40.0%of occupied Centralia homes are rented
In rented homes the owner or manager approves the scope; tenants can still send the photos. U.S. Census Bureau, 2020–2024 ACS 5-year estimates
Separate unit and common-area quantities
About 17% of Centralia's housing, some 1,400 homes, is in buildings with five or more units, against under 7% across Lewis County. We count units apart from corridors, stairs, service rooms and amenity spaces. Typical-unit sheets help, but mirrored and revised units change openings, so we check them against the current floor plans before multiplying.
U.S. Census Bureau, ACS 2020-2024 5-year estimates, units in structure
Follow the specified assemblies
Walls between units and around exits often carry fire or sound requirements. We work from the approved assembly tags, shaft and ceiling details, board layers, insulation and penetrations. The plans and the building official set the requirement, and we build the listed drywall work.
Gypsum Association GA-600 fire-resistance and sound-control designs
Coordinate delivery, close-in, and punch work
When an existing building is renovated, Washington law has the owner get an accredited asbestos inspection and give the report to contractors before they bid. If that survey finds asbestos that has to come out, the Southwest Clean Air Agency sets a 10-day wait after the notice before a certified contractor can remove it, and the close-in schedule has to allow for it. On new work, staging, material routes and the readiness of in-wall trades drive the sequence. Protection and cleanup in shared halls or occupied units is priced when the documents ask for it, and punch-list repairs stay out of the base quantity.
Washington asbestos good faith inspection rule, RCW 49.26.013
What we need to bid the building
Architectural and reflected ceiling plans, unit and common-area schedules, wall types, finish requirements, phase lines, access limits and the bid date. Alternates go on their own line.
Multifamily Drywall Installation questions in Centralia
Can multifamily drywall be estimated by unit type?
Yes, as a starting point. Mirrored layouts, revisions, common areas and assembly changes get checked before the number is final.
Does unit separation automatically establish a fire or sound rating?
No. Each separation follows the approved assembly detail on the plans.
Request an estimate
A Centralia multifamily bid starts from the current plan set, the unit mix, wall schedules, phase lines and the bid date.
(360) 350-8616Share the project details
Share a plan link, add PDF plan sheets, or email your bid packet. Then add your contact details and project ZIP so we can follow up.
Text us photos for a quick estimate!