ADU Drywall in Centralia, WA
Solis Interiors provides ADU drywall installation and finishing in Centralia, taking the board, taping and surface finish through one coordinated scope. ADU rules in Centralia, Washington are more permissive than most of the region's. The city allows two accessory dwelling units on a lot in six residential zones and does not require the owner to live on site. Solis installs the drywall scope from the approved plans.
Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile

Carry an ADU from board installation through finish
An accessory dwelling has rooms, openings, and finish choices that need to come together before the walls close in. If the plan stops at board, taping and finishing can fall outside the schedule the project is working toward.
Solis installs ADU drywall from the room layout and drawings, then carries the work through taping and the selected finish. Those stages connect the wall surfaces to the dwelling's planned layout and target schedule.
- ADU board installation tied to the room layout.
- Taping and finishing carried into the project sequence.
Here’s how we get it handled
Text us photos or call
A close-up, a wider view and your city give us a useful starting point. You can also call and talk through the work.
Agree the scope and schedule
We review the work with you, arrange a site visit where needed and put the agreed scope and finish in your estimate.
Get the space finished
Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.
Have a project in mind? Send us a photo.
Tell us what needs fixing or finishing. We’ll take it from there.
What to plan for in Centralia
These local conditions help us ask better questions before we price the drywall scope.
- 23% Before 1940
- 11% 1940–1959
- 22% 1960–1979
- 28% 1980–1999
- 16% 2000 or later
- Centralia two-ADU allowance
Centralia permits up to two accessory dwelling units per lot in R-5A, R:2, R:4, R:8, R:15 and R:20, and does not require owner-occupancy. Ordinance 2539 amended Ordinance 2445.
- Centralia ADU height and parking
An ADU structure is capped at 30 feet against 24 feet for other accessory buildings, with one parking space required except near transit. Both shape the site before drywall is priced.
- Centralia ADU zonesTwo per lot in six zones
Centralia permits up to two accessory dwelling units per lot in R-5A, R:2, R:4, R:8, R:15 and R:20, and does not require owner-occupancy. Ordinance 2539 amended Ordinance 2445. Washington State Legislature: RCW 36.70A.635 (middle housing) and 36.70A.680 (ADUs)
- Centralia ADU limits30 feet, one space
An ADU structure is capped at 30 feet against 24 feet for other accessory buildings, with one parking space required except near transit. Both shape the site before drywall is priced.
Two units per lot, and no owner-occupancy requirement
Centralia allows up to two accessory dwelling units per lot in the R-5A, R:2, R:4, R:8, R:15 and R:20 zones, and the code states that owner-occupancy is not required. That combination opens the garage and lower-level conversion to owners who do not intend to live in the new unit themselves. Ordinance 2539 sections 12 to 17 (2023) amended Ordinance 2445 (2020). The approved plans and the local authority determine the requirement; Solis scopes the listed drywall work and coordinates the relevant handoff.
The 30-foot cap and the parking rule are the local details
Centralia caps an accessory dwelling structure at 30 feet, against 24 feet for other accessory buildings, and requires one parking space per ADU except within half a mile of a transit stop. Those two numbers decide how much building fits on a lot and where a driveway has to go, which is usually settled before anyone prices drywall.
What changes the estimate?
Access, occupied-room protection, substrate condition, ceiling height, and the requested finish all change the work sequence in Centralia, Washington. Send photos, dimensions, and the drawings or finish notes already available so Solis can separate visible drywall work from questions for the designer, inspector, or another specialist. For an ADU, the approved wall and ceiling details control fire, sound, and air-sealing questions; Solis prices the listed drywall work without promising a permit or inspection result.
Common questions
What should I send for a Centralia adu drywall estimate?
Send wide and close photos, room dimensions, ceiling height, access notes, and the finish or project documents you have. Those details help us identify the practical next step before a site review.
What is outside a Centralia drywall estimate?
Design approvals, permit decisions, hazardous-material testing or abatement, structural engineering, restoration drying, and other specialist work remain separate when the project requires them. We identify that boundary before pricing the drywall scope.
Share the project details
Choose the work you need and tell us how to reach you.
Text us photos for a quick estimate!