Serving Thurston, Pierce & Lewis countiesLicensed · Bonded · Insured · SOLISIL785NT(360) 350-8616

Basement drywall for Olympia homes, hung and finished

We install and finish basement drywall in Olympia once the framing, insulation and moisture questions are settled. Board, tape and the surface finish are ours; framing, insulation and drainage stay separate unless the quote names them.

Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile

Closet interior with flat drywall sheets visible before finishing.
Drywall sheets installed in a closet, before finishing.

Finish basement walls around utilities and room use

A basement can have utility access points, a history of water, and walls that need a finish suited to the planned room. Covering those details with board too early can put access or the finish plan out of step with the space.

Solis installs or repairs basement drywall around the existing construction, utility access, moisture history, and intended finish. With the room layout carried into board and finishing work, the completed walls can fit how the basement will be used.

  • Drywall installed or repaired for the planned room.
  • Utility access retained in the finished layout.

Here’s how we get it handled

  1. Text us photos or call

    A close-up, a wider view and your city give us a useful starting point. You can also call and talk through the work.

  2. Agree the scope and schedule

    We review the work with you, arrange a site visit where needed and put the agreed scope and finish in your estimate.

  3. Get the space finished

    Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.

Have a project in mind? Send us a photo.

Tell us what needs fixing or finishing. We’ll take it from there.

Basement drywall in Olympia homes

When Olympia's homes were built shapes what is behind the wall and which rules apply to the work.

  1. 12% Before 1940
  2. 13% 1940–1959
  3. 23% 1960–1979
  4. 28% 1980–1999
  5. 25% 2000 or later
Share of Olympia homes by year built. U.S. Census Bureau, 2020–2024 ACS 5-year estimates
1982Median year Olympia homes were built

Half of Olympia's homes were built before 1982 and half after. New walls in an existing home are finished to meet what is already there, so the home's age shapes the finish plan. U.S. Census Bureau, ACS 2020–2024, median year structure built

24.8%of Olympia homes were built in 2000 or later

Newer homes are almost all drywall over wood framing, which keeps new work and the existing walls consistent. U.S. Census Bureau, 2020–2024 ACS 5-year estimates

PermitAlterations and repairs in Olympia

Olympia lists building alterations or repairs among work that needs a permit, while painting and similar finish work is exempt. Exempt work must still meet code. City of Olympia, what do I need

Fit board to the room and wall assembly

We hang board to the room layout, working around doors, windows, stairs, soffits and the mechanical room. Where the plans call for a fire or sound assembly, that detail decides the board and layers. Otherwise we follow the plan's panels and transitions room by room.

Gypsum Association GA-216 application and finishing of gypsum panels

Finish the surfaces for how the basement will be used

A bedroom, a family room and a storage room can all take different finishes. We price board, tape, texture, primer and paint separately and keep service panels reachable. If you'd like the furnace room left unfinished, it stays off the quote.

Resolve moisture conditions before closing walls

If the basement has a history of seepage, that gets solved before drywall. EPA clean-water guidance explains when wet drywall can be dried in place and when swollen board has to go, and notes that wall cavities dry slowly. Drainage and waterproofing come before us.

U.S. EPA Mold Course, Chapter 4: water-damaged drywall guidance

Olympia permits for new basement rooms

Olympia's permit guide puts building alterations on the list of work that needs a permit, and finish work like painting on the list that usually doesn't. If finishing the basement adds a bedroom or new walls, check with the city before we hang board.

City of Olympia, what do I need (permit guide)

Sketch the basement for us

Text a floor sketch or photos of each framed room, the ceiling heights and any water history. We'll price it room by room so you can finish in stages.

Basement Drywall questions in Olympia

Can drywall be installed over a basement wall with a water history?

Once the source is fixed and the wall is dry, yes. We look at the framing and cavity before we hang anything.

Does basement drywall include framing or insulation?

Not unless the quote says so. Tell us who's doing framing and insulation, and we'll start when they're done.

Request an estimate

For an Olympia basement, text a floor sketch or room photos, the ceiling heights and any history of water.

(360) 350-8616

Share the project details

Choose the work you need and tell us how to reach you.

What are you planning?

Basement Drywall & Finishing

Photos up to 25 MB before prep. Up to 5 files, 40 MB total. Private with your request; photo location metadata is removed.

Add project details or a contact preference

We’ll use these details to respond to your project request.

Text us photos for a quick estimate!