Serving Thurston, Pierce & Lewis countiesLicensed · Bonded · Insured · SOLISIL785NT(360) 350-8616

Fire-rated walls built to plan in Yelm

We frame and board for fire-rated drywall installation in Yelm, and every rated wall we build follows the approved plans down to the fastener spacing and the sealed penetrations. That's what an inspector checks, and it's what our proposal prices.

Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile

Install fire-rated drywall to the specified assembly

A fire-rated wall depends on the assembly shown in the project details, along with the sequence for framing and board work. Treating the board as a stand-alone item can leave installation steps disconnected from the design.

Solis installs the specified fire-rated drywall assembly from the project details and required sequence. Carrying the assembly notes into the board work keeps installation connected to the drawings and the surrounding construction.

  • Fire-rated drywall installed to the specified assembly.
  • Board work follows the project sequence.

Here’s how we get it handled

  1. Text us photos or call

    A close-up, a wider view and your city give us a useful starting point. You can also call and talk through the work.

  2. Agree the scope and schedule

    We review the work with you, arrange a site visit where needed and put the agreed scope and finish in your estimate.

  3. Get the space finished

    Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.

Have a project in mind? Send us a photo.

Tell us what needs fixing or finishing. We’ll take it from there.

Fire-Rated drywall installation in Yelm homes

When Yelm's homes were built shapes what is behind the wall and which rules apply to the work.

  1. 6% Before 1940
  2. under 1% 1940–1959
  3. 9% 1960–1979
  4. 22% 1980–1999
  5. 63% 2000 or later
Share of Yelm homes by year built. U.S. Census Bureau, 2020–2024 ACS 5-year estimates
2004Median year Yelm homes were built

Half of Yelm's homes were built before 2004 and half after. New walls in an existing home are finished to meet what is already there, so the home's age shapes the finish plan. U.S. Census Bureau, ACS 2020–2024, median year structure built

62.5%of Yelm homes were built in 2000 or later

Newer homes are almost all drywall over wood framing, which keeps new work and the existing walls consistent. U.S. Census Bureau, 2020–2024 ACS 5-year estimates

PermitAlterations in Yelm

Yelm says new structures, additions and alterations usually require a building permit. Its listed exceptions are fences, low decks and small sheds. City of Yelm, permit FAQ

Yelm building permits

Yelm's permit FAQ says new structures, additions and alterations usually require a building permit; its listed exceptions are fences, low decks and small sheds. City of Yelm, permit FAQ

Follow the listed assembly in the plans

A fire rating belongs to a complete tested design: framing, board type and layers, fasteners, joint treatment, insulation and penetrations. GA-600 lists those designs for gypsum walls. One sheet of rated board isn't a rated wall, so we build every part of the design named on your drawings.

Gypsum Association GA-600 fire-resistance and sound-control designs

Coordinate seams, penetrations and adjacent trades

Corners, wall heads, joints and openings each have a detail. Electrical boxes, ducts and doors may have their own. Those need to show on the current plans before we start. If someone proposes a substitution or a layout change, it goes back to the designer or the building official.

Separate the drywall scope from code decisions

You may know a wall is rated without knowing what makes it so. The plans name the design and where it applies; the city and your designer set the requirement. We build what's on the approved plans and coordinate with the project team, and our proposal stays tied to those documents.

Gypsum Association GA-600 fire-resistance and sound-control designs

Plan the specified assembly in Yelm

Rated walls in Yelm usually arrive with approved plans, since the city's FAQ says most construction, alterations included, needs a building permit. Send the wall schedule and the current revision, and we'll list the layers and finish for each rated wall.

City of Yelm, permit FAQ

Fire-Rated Drywall Installation questions in Yelm

Does fire-rated drywall alone create a rated wall?

No. The rating belongs to the whole assembly and every detail in it.

Can Solis choose the required fire rating?

No. The approved plans and the city set the requirement. We build what those documents show.

Request an estimate

Send the approved Yelm wall schedule, the current revision and details for openings and penetrations.

(360) 350-8616

Share the project details

Choose the work you need and tell us how to reach you.

What are you planning?

Fire-Rated Drywall Assemblies

Photos up to 25 MB before prep. Up to 5 files, 40 MB total. Private with your request; photo location metadata is removed.

Add project details or a contact preference

We’ll use these details to respond to your project request.

Text us photos for a quick estimate!