Serving Thurston, Pierce & Lewis countiesLicensed · Bonded · Insured · SOLISIL785NT(360) 350-8616

Multifamily Drywall in Yelm, WA

Solis Interiors provides multifamily drywall installation and finishing in Yelm, planning unit and common-area work around the specified assemblies and project schedule. In Yelm, Washington, the apartment market is recent and still growing. The city's own project list records four completed apartment buildings of 48 to 80 units, and more than a quarter of the city's housing went up between 2010 and 2019. Solis installs and finishes the board scope on repeated unit layouts.

Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile

Closet interior with flat drywall sheets visible before finishing.
Drywall sheets installed in a closet, before finishing.

Keep multifamily drywall moving with the unit schedule

Unit renovations and shared-wall projects bring access windows, occupied areas, and specified assemblies into the drywall sequence. A one-size plan can leave board and finishing out of step with the rooms or units that are ready.

Solis installs and finishes multifamily drywall around unit access, sequencing, and the specified wall assemblies. Tying the work to those conditions helps the crew move through the planned areas without losing the finish handoff between units.

  • Drywall work aligned with unit access and sequence.
  • Board and finish carried through the specified areas.
Solis Interiors hanging drywall on a commercial job. See the work →

From bid packet to finished scope

  1. Send the bid packet

    Share plans, finish schedules and your bid date. Solis offers 24–48-hour takeoffs.

  2. Agree the scope and schedule

    Review the itemized scope, assembly details and trade handoffs with Solis before scheduling the work.

  3. Get the space finished

    Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.

Have plans ready? Let’s price the work.

Send a plan link or attach your PDF through the project form.

What to plan for in Yelm

These local conditions help us ask better questions before we price the drywall scope.

  1. 6% Before 1940
  2. under 1% 1940–1959
  3. 9% 1960–1979
  4. 22% 1980–1999
  5. 63% 2000 or later
Share of Yelm homes by year built. U.S. Census Bureau, 2020–2024 ACS 5-year estimates
Yelm repeated unit layouts

Recent Yelm apartment buildings of 48 to 80 units repeat the same wall type across dozens of units, so the takeoff follows the drawings for the whole building.

No middle-housing mandate in Yelm

RCW 36.70A.635 applies by city population tier and Yelm sits outside it. Nothing in state law mandates added density here.

Yelm apartment completionsFirst unit sets the standard

Recent Yelm apartment buildings of 48 to 80 units repeat the same wall type across dozens of units, so the takeoff follows the drawings for the whole building.

Yelm density not mandatedMarket construction

RCW 36.70A.635 applies by city population tier and Yelm sits outside it. Nothing in state law mandates added density here. Washington State Legislature: RCW 36.70A.635 (middle housing) and 36.70A.680 (ADUs)

Four recent apartment buildings set the local template

Yelm's Master Project List records Ridgeline Apartments at 80 units, Wyndstone at 75, Nisqually Landing at 50 and Tahoma Terrace at 48 as complete. Buildings at that scale repeat the same wall type across dozens of units, so the takeoff follows the drawings for the whole building. The approved wall types and inspection handoffs control the assembly; Solis installs the listed drywall scope.

Middle housing does not bind Yelm, so the new units come from the market

RCW 36.70A.635 applies to cities by population tier, and Yelm sits outside it. Nothing in state law requires Yelm to permit additional units on a single-family lot. What is happening here is market apartment construction, with 7.1% of the city's housing already in buildings of twenty or more units.

What changes the estimate?

Access, occupied-room protection, substrate condition, ceiling height, and the requested finish all change the work sequence in Yelm, Washington. Send photos, dimensions, and the drawings or finish notes already available so Solis can separate visible drywall work from questions for the designer, inspector, or another specialist. For repeated units, the approved wall types and inspection handoffs control fire and acoustic details; the estimate keeps unit, corridor, stair, and utility-room scopes legible.

Common questions

What should I send for a Yelm multifamily drywall estimate?

Send wide and close photos, room dimensions, ceiling height, access notes, and the finish or project documents you have. Those details help us identify the practical next step before a site review.

What is outside a Yelm drywall estimate?

Design approvals, permit decisions, hazardous-material testing or abatement, structural engineering, restoration drying, and other specialist work remain separate when the project requires them. We identify that boundary before pricing the drywall scope.

Share the project details

Share a plan link, add PDF plan sheets, or email your bid packet. Then add your contact details and project ZIP so we can follow up.

What are you planning?

Multifamily Drywall Installation & Finishing

Email bid packet

Photos up to 25 MB before prep; PDFs up to 20 MB. Up to 5 files, 40 MB total. Private with your request; photo location metadata is removed.

Company, schedule & project notes

We’ll use these details to respond to your project request.

Text us photos for a quick estimate!