Commercial drywall for Tacoma tenant buildouts
Solis Interiors works as a commercial drywall contractor in Tacoma on tenant buildouts downtown and near the Port of Tacoma, framing partitions in steel and hanging and finishing the board in your drawings. Bring us the drawings, the phase boundaries and the site rules, and we bid the work they show.
Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile

Move commercial walls from layout through finish
Commercial drywall has to fit the drawings, access window, other trades, and required sequence. If board installation and finishing fall out of step with the project, crews can face unfinished areas during the next handoff.
Solis installs and finishes commercial drywall around the project layout, specified assemblies, access, and schedule. Coordinating those stages keeps the board and finish work connected to the job sequence and gives the project team a clear handoff for each area.
- Board and finishing work aligned to the project sequence.
- A clear drywall handoff for the next trade.
From bid packet to finished scope
Send the bid packet
Share plans, finish schedules and your bid date. Solis offers 24–48-hour takeoffs.
Agree the scope and schedule
Review the itemized scope, assembly details and trade handoffs with Solis before scheduling the work.
Get the space finished
Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.
Have plans ready? Let’s price the work.
Send a plan link or attach your PDF through the project form.
Commercial drywall contractor in Tacoma
- Keep the Tacoma commercial scope to the tenant area
The Port of Tacoma lists both industrial land and office space among its real-estate offerings near the marine terminals. For an office or tenant improvement in that setting, Solis can separate suite walls, ceilings, and finish boundaries from the rest of the property in your quote. Port of Tacoma Available Properties
Translate drawings into a defined scope
We take off from the wall types, reflected ceiling plans, openings and finish schedules. New partitions, infill, repairs and untouched areas get separate lines, and we mark where drywall meets doors, glazing, ceilings and millwork, so the bid covers the same rooms as the drawings.
Coordinate phasing and site conditions
A buildout in an occupied downtown building can come with shared elevators, delivery windows and set work hours. Tell us the rules the owner or general contractor has set and the sequence you need, and we plan the crew around them.
Keep assembly requirements with the plans
Fire-resistance and sound ratings belong to the approved assembly, with its board layers, studs, insulation, fasteners, joints and penetrations. We build to the listed design and send any change to the architect. Our steel framing meets ASTM C645, the standard for nonstructural steel studs and track.
Gypsum Association guidance on complete fire-resistance assemblies
Bid documents we work from
Send the current plan set, wall and ceiling schedules, finish levels, phase boundaries, access rules and the bid date. Put alternates on their own so the base bid stays clean.
Commercial Drywall Contractor questions in Tacoma
Can a commercial drywall quote follow a tenant-improvement plan set?
Yes. We bid from the plan set, wall types, ceiling schedules and finish notes, and list anything the drawings leave open.
Does drywall installation establish a fire rating?
No. The rating comes from the whole tested assembly as designed and approved. We install our part of it to the listed detail.
Request an estimate
Tacoma bids: send the drawing set, finish schedule, phase plan and bid due date.
(360) 350-8616Share the project details
Share a plan link, add PDF plan sheets, or email your bid packet. Then add your contact details and project ZIP so we can follow up.
Text us photos for a quick estimate!