Steel stud partitions and drywall in Tacoma
We build Tacoma partitions with metal stud framing and drywall, using ASTM C645 steel studs and track and the board your plans call for. Wall type, height, openings and head details come from your drawings, and structural or fire-rated design stays with your architect or engineer.
Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile
Keep metal framing and drywall on the same layout
Walls, openings, dimensions, and board requirements all have to meet the project layout. When framing and drywall are treated as separate tasks, a missed opening or handoff detail can slow the next stage of a renovation or build-out.
Solis builds interior metal-stud and drywall assemblies to the specified layout, carrying openings and finish handoff through the work. That keeps framing and board connected to the project documents and the sequence shared with other trades.
- Metal framing and board follow the specified layout.
- Openings and finish handoff carried through the work.
From bid packet to finished scope
Send the bid packet
Share plans, finish schedules and your bid date. Solis offers 24–48-hour takeoffs.
Agree the scope and schedule
Review the itemized scope, assembly details and trade handoffs with Solis before scheduling the work.
Get the space finished
Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.
Have plans ready? Let’s price the work.
Send a plan link or attach your PDF through the project form.
Metal stud framing and drywall in Tacoma homes
When Tacoma's homes were built shapes what is behind the wall and which rules apply to the work.
- 27% Before 1940
- 16% 1940–1959
- 21% 1960–1979
- 18% 1980–1999
- 18% 2000 or later
- 1967Median year Tacoma homes were built
Half of Tacoma's homes were built before 1967 and half after. New walls in an existing home are finished to meet what is already there, so the home's age shapes the finish plan. U.S. Census Bureau, ACS 2020–2024, median year structure built
- 17.9%of Tacoma homes were built in 2000 or later
Newer homes are almost all drywall over wood framing, which keeps new work and the existing walls consistent. U.S. Census Bureau, 2020–2024 ACS 5-year estimates
- PermitInterior demolition in Tacoma
Tacoma exempts painting and similar finish work, but its alteration permit covers repairs, remodels and partial or interior demolition. City of Tacoma, residential permits
Start with the wall type and drawings
We take each partition by its plan tag and note height, length, openings, intersections and finish. Stud gauge, spacing, deflection track and board come from the drawings and schedules. If a detail is missing, we flag it in the bid and ask.
Coordinate openings and adjacent work
Door frames, service openings, backing plates and head conditions above the ceiling all need agreement with the project team before we close a wall. We list what each opening includes and who supplies its frame or support, and we record penetrations before the board goes on.
Keep assembly performance tied to the design
When a partition also carries a fire or sound rating, the documented assembly sets every layer: studs, gypsum, insulation, fasteners, joints and penetrations. We build to the approved detail and send substitutions to the design professional.
Gypsum Association GA-600 fire-resistance and sound-control designs
Where we frame in Tacoma
In Tacoma we frame steel partitions for commercial tenant buildouts downtown and near the Port of Tacoma. Send plan tags, elevations, wall heights, openings and the finish schedule, plus any assembly details that apply.
Metal Stud Framing and Drywall questions in Tacoma
Can the drywall contractor choose the framing system?
No. That choice sits with the design professional and the approved drawings. We price what's drawn and point out details that are missing.
Does metal framing make a wall fire rated?
No. A rating belongs to a complete tested assembly, and the steel studs are one part of it.
Request an estimate
For Tacoma steel framing, send the framing sheets, wall tags, elevations and assembly notes.
(360) 350-8616Share the project details
Share a plan link, add PDF plan sheets, or email your bid packet. Then add your contact details and project ZIP so we can follow up.
Text us photos for a quick estimate!