Serving Thurston, Pierce & Lewis countiesLicensed · Bonded · Insured · SOLISIL785NT(360) 350-8616

Metal-stud partitions, framed to finished, in DuPont

We handle metal stud framing and drywall in DuPont as one package, framing the partitions in steel, boarding them and finishing the joints to the specified surface. The work starts from your wall layout and openings and runs through whichever board and finish stages the estimate names.

Washington licensed, bonded and insured, L&I SOLISIL785NT.Check with L&IAngi reviewsGoogle profile

Keep metal framing and drywall on the same layout

Walls, openings, dimensions, and board requirements all have to meet the project layout. When framing and drywall are treated as separate tasks, a missed opening or handoff detail can slow the next stage of a renovation or build-out.

Solis builds interior metal-stud and drywall assemblies to the specified layout, carrying openings and finish handoff through the work. That keeps framing and board connected to the project documents and the sequence shared with other trades.

  • Metal framing and board follow the specified layout.
  • Openings and finish handoff carried through the work.

From bid packet to finished scope

  1. Send the bid packet

    Share plans, finish schedules and your bid date. Solis offers 24–48-hour takeoffs.

  2. Agree the scope and schedule

    Review the itemized scope, assembly details and trade handoffs with Solis before scheduling the work.

  3. Get the space finished

    Solis completes the agreed work and reviews the finish with you. Include interior painting in the scope for a complete drywall-and-paint handoff.

Have plans ready? Let’s price the work.

Send a plan link or attach your PDF through the project form.

Metal stud framing and drywall in DuPont homes

When DuPont's homes were built shapes what is behind the wall and which rules apply to the work.

  1. 6% Before 1940
  2. under 1% 1940–1959
  3. 8% 1960–1979
  4. 24% 1980–1999
  5. 63% 2000 or later
Share of DuPont homes by year built. U.S. Census Bureau, 2020–2024 ACS 5-year estimates
2002Median year DuPont homes were built

Half of DuPont's homes were built before 2002 and half after. New walls in an existing home are finished to meet what is already there, so the home's age shapes the finish plan. U.S. Census Bureau, ACS 2020–2024, median year structure built

62.5%of DuPont homes were built in 2000 or later

Newer homes are almost all drywall over wood framing, which keeps new work and the existing walls consistent. U.S. Census Bureau, 2020–2024 ACS 5-year estimates

Partition layout from the drawings

The floor plan gives us partition locations. Elevations add the wall heights, openings, soffits and ceiling connections. Doors, backing, access panels and service cutouts are marked up front, which also shows which walls stop at the ceiling, which continue above it and which tie into a rated or sound assembly.

Coordinate the frame with panel layout

Steel goes up on the wall lines and dimensions in the current drawings, with backing and access built in before any board is hung. GA-216 covers how the gypsum panels are applied and finished, and your drawings set the framing system and any special construction.

Gypsum Association GA-216 application and finishing of gypsum panels

Carry special requirements through each interface

A partition in a fire or sound design keeps that design at doors, intersections and penetrations, and studs alone never create a rated wall. Frame, board, insulation and joint treatment all have to match the selected system, so we build from its reference.

Gypsum Association GA-600 fire-resistance and sound-control designs

Framing-and-board estimate

Send the partition schedule, wall heights, openings, backing plan, ceiling transitions, board requirements and finish schedule. Tell us if you want framing, board, taping or all three. We price each wall type and show where every step stops.

Metal Stud Framing and Drywall questions in DuPont

Can metal framing and drywall be part of one proposal?

Yes. Framing, board, taping and paint prep can be one package or separate lines.

Does metal-stud framing automatically provide a fire rating?

No. A rating comes from a complete listed assembly and its details.

Request an estimate

Send the partition schedule and elevations, and the steps you want us to carry.

(360) 350-8616

Share the project details

Share a plan link, add PDF plan sheets, or email your bid packet. Then add your contact details and project ZIP so we can follow up.

What are you planning?

Metal Stud Framing & Drywall

Email bid packet

Photos up to 25 MB before prep; PDFs up to 20 MB. Up to 5 files, 40 MB total. Private with your request; photo location metadata is removed.

Company, schedule & project notes

We’ll use these details to respond to your project request.

Text us photos for a quick estimate!